{"id":55092,"date":"2026-06-01T16:12:13","date_gmt":"2026-06-01T16:12:13","guid":{"rendered":"https:\/\/xtmim.com\/?page_id=55092"},"modified":"2026-06-01T16:12:20","modified_gmt":"2026-06-01T16:12:20","slug":"rfq-preparation-guide","status":"publish","type":"page","link":"https:\/\/xtmim.com\/tr\/rfq-preparation-guide\/","title":{"rendered":"MIM Teklif Talebi Haz\u0131rlama Rehberi"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"55092\" class=\"elementor elementor-55092\" data-elementor-post-type=\"page\">\n\t\t\t\t<div class=\"elementor-element elementor-element-426eb74 e-con-full e-flex cmsmasters-bg-hide-none cmsmasters-bg-hide-none cmsmasters-block-default e-con e-parent\" data-id=\"426eb74\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-877f882 e-flex e-con-boxed cmsmasters-block-default e-con e-child\" data-id=\"877f882\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1f18aba cmsmasters-block-default cmsmasters-sticky-default elementor-widget elementor-widget-heading\" data-id=\"1f18aba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h1 class=\"elementor-heading-title elementor-size-default\">MIM RFQ Preparation Guide<\/h1>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d3c6914 e-con-full e-flex cmsmasters-block-default e-con e-parent\" data-id=\"d3c6914\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-0f209c5 e-flex e-con-boxed cmsmasters-block-default e-con e-child\" data-id=\"0f209c5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-78eaef3 cmsmasters-block-default cmsmasters-sticky-default elementor-widget elementor-widget-html\" data-id=\"78eaef3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t\t<style>\r\n  .xtmim-rfq-guide {\r\n    --xt-primary: #1f4e79;\r\n    --xt-primary-dark: #163a5a;\r\n    --xt-primary-soft: #eaf3fb;\r\n    --xt-bg: #ffffff;\r\n    --xt-bg-soft: #f6f9fc;\r\n    --xt-border: #d9e2ea;\r\n    --xt-text: #263238;\r\n    --xt-muted: #5f6f7a;\r\n    --xt-radius-lg: 22px;\r\n    --xt-shadow-sm: 0 8px 28px rgba(16, 42, 67, 0.05);\r\n    --xt-shadow-md: 0 14px 38px rgba(16, 42, 67, 0.08);\r\n    --xt-container: 1600px;\r\n    max-width: var(--xt-container);\r\n    margin: 0 auto;\r\n    padding: 0 18px 56px;\r\n    color: var(--xt-text);\r\n    font-size: 16px;\r\n    line-height: 1.72;\r\n    overflow-wrap: break-word;\r\n  }\r\n\r\n  .xtmim-rfq-guide,\r\n  .xtmim-rfq-guide section,\r\n  .xtmim-rfq-guide nav,\r\n  .xtmim-rfq-guide div,\r\n  .xtmim-rfq-guide figure,\r\n  .xtmim-rfq-guide img,\r\n  .xtmim-rfq-guide table,\r\n  .xtmim-rfq-guide th,\r\n  .xtmim-rfq-guide td,\r\n  .xtmim-rfq-guide a {\r\n    box-sizing: border-box;\r\n  }\r\n\r\n  .xtmim-rfq-guide a {\r\n    color: var(--xt-primary);\r\n    text-decoration: none;\r\n    border-bottom: 1px solid rgba(31, 78, 121, 0.28);\r\n  }\r\n\r\n  .xtmim-rfq-guide a:hover {\r\n    color: var(--xt-primary-dark);\r\n    border-bottom-color: var(--xt-primary-dark);\r\n  }\r\n\r\n  .xtmim-rfq-guide p {\r\n    margin: 0 0 16px;\r\n  }\r\n\r\n  .xtmim-rfq-guide h2 {\r\n    margin: 0 0 18px;\r\n    color: #17324d;\r\n    font-size: clamp(1.55rem, 2.2vw, 2.15rem);\r\n    line-height: 1.25;\r\n    letter-spacing: -0.02em;\r\n  }\r\n\r\n  .xtmim-rfq-guide h3 {\r\n    margin: 28px 0 12px;\r\n    color: #20384f;\r\n    font-size: clamp(1.18rem, 1.55vw, 1.42rem);\r\n    line-height: 1.32;\r\n  }\r\n\r\n  .xtmim-rfq-guide ul,\r\n  .xtmim-rfq-guide ol {\r\n    margin: 0 0 18px 20px;\r\n    padding: 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide li {\r\n    margin: 6px 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-hero {\r\n    margin: 0 0 24px;\r\n    border-radius: 24px;\r\n    overflow: hidden;\r\n    border: 1px solid var(--xt-border);\r\n    box-shadow: var(--xt-shadow-md);\r\n    background: #eef3f7;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-hero-img,\r\n  .xtmim-rfq-guide .xtmim-figure img {\r\n    display: block;\r\n    width: 100%;\r\n    height: auto;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-intro {\r\n    margin: 24px 0 30px;\r\n    padding: clamp(22px, 3.2vw, 38px);\r\n    border-radius: 24px;\r\n    background: linear-gradient(135deg, #f8fbfe 0%, #edf5fb 100%);\r\n    border: 1px solid #d7e6f2;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-intro p {\r\n    font-size: 1.04rem;\r\n    color: #31465a;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-eyebrow {\r\n    display: inline-flex;\r\n    align-items: center;\r\n    gap: 8px;\r\n    margin-bottom: 14px;\r\n    padding: 7px 12px;\r\n    border-radius: 999px;\r\n    background: #ffffff;\r\n    color: var(--xt-primary-dark);\r\n    font-weight: 700;\r\n    font-size: 0.86rem;\r\n    border: 1px solid #d4e4f0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-eyebrow::before {\r\n    content: \"\";\r\n    width: 8px;\r\n    height: 8px;\r\n    flex: 0 0 8px;\r\n    border-radius: 50%;\r\n    background: #2f6f9f;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary {\r\n    margin: 28px 0 30px;\r\n    padding: clamp(22px, 3vw, 34px);\r\n    border-radius: var(--xt-radius-lg);\r\n    background: #ffffff;\r\n    border: 1px solid var(--xt-border);\r\n    box-shadow: var(--xt-shadow-sm);\r\n    scroll-margin-top: 90px;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary-grid {\r\n    display: grid;\r\n    grid-template-columns: 1.2fr 0.8fr;\r\n    gap: 18px;\r\n    align-items: start;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary-list {\r\n    margin: 14px 0 0;\r\n    padding: 0;\r\n    list-style: none;\r\n    display: grid;\r\n    gap: 10px;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary-list li {\r\n    position: relative;\r\n    margin: 0;\r\n    padding: 10px 12px 10px 34px;\r\n    border-radius: 12px;\r\n    border: 1px solid #dce8f1;\r\n    background: var(--xt-bg-soft);\r\n    color: #31475a;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary-list li::before {\r\n    content: \"\u2713\";\r\n    position: absolute;\r\n    left: 12px;\r\n    top: 9px;\r\n    color: var(--xt-primary);\r\n    font-weight: 800;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary-callout {\r\n    padding: 18px;\r\n    border-radius: 18px;\r\n    background: var(--xt-primary-soft);\r\n    border: 1px solid #cfe0ee;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary-callout strong {\r\n    display: block;\r\n    margin-bottom: 8px;\r\n    color: #17324d;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-summary-callout p {\r\n    margin: 0;\r\n    color: #34495a;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-toc {\r\n    margin: 28px 0 30px;\r\n    padding: 20px;\r\n    border-radius: var(--xt-radius-lg);\r\n    background: var(--xt-bg-soft);\r\n    border: 1px solid var(--xt-border);\r\n    box-shadow: var(--xt-shadow-sm);\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-toc strong {\r\n    display: block;\r\n    margin-bottom: 12px;\r\n    color: #17324d;\r\n    font-size: 1.05rem;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-toc ul {\r\n    display: grid;\r\n    grid-template-columns: repeat(2, minmax(0, 1fr));\r\n    gap: 8px 18px;\r\n    margin: 0;\r\n    padding: 0;\r\n    list-style: none;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-toc li {\r\n    margin: 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-toc a {\r\n    display: inline-block;\r\n    padding: 4px 0;\r\n    font-weight: 650;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-section {\r\n    margin: 30px 0;\r\n    padding: clamp(22px, 3vw, 34px);\r\n    background: var(--xt-bg);\r\n    border: 1px solid var(--xt-border);\r\n    border-radius: var(--xt-radius-lg);\r\n    box-shadow: var(--xt-shadow-sm);\r\n    scroll-margin-top: 90px;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-section.xtmim-soft {\r\n    background: linear-gradient(180deg, #ffffff 0%, var(--xt-bg-soft) 100%);\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-grid {\r\n    display: grid;\r\n    gap: 16px;\r\n    margin: 22px 0 4px;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-grid-2 {\r\n    grid-template-columns: repeat(2, minmax(0, 1fr));\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-grid-3 {\r\n    grid-template-columns: repeat(3, minmax(0, 1fr));\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-card,\r\n  .xtmim-rfq-guide .xtmim-path-card {\r\n    padding: 18px;\r\n    border-radius: 18px;\r\n    background: var(--xt-bg-soft);\r\n    border: 1px solid var(--xt-border);\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-card strong,\r\n  .xtmim-rfq-guide .xtmim-path-card strong {\r\n    display: block;\r\n    margin-bottom: 8px;\r\n    color: #17324d;\r\n    font-size: 1rem;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-card p,\r\n  .xtmim-rfq-guide .xtmim-path-card p {\r\n    margin: 0;\r\n    color: var(--xt-muted);\r\n    font-size: 0.96rem;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-path-card a {\r\n    display: inline-block;\r\n    margin-top: 12px;\r\n    font-weight: 800;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-figure {\r\n    margin: 26px 0;\r\n    border-radius: var(--xt-radius-lg);\r\n    overflow: hidden;\r\n    background: var(--xt-bg-soft);\r\n    border: 1px solid var(--xt-border);\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-figure figcaption {\r\n    padding: 14px 18px 0;\r\n    color: #32475a;\r\n    font-size: 0.95rem;\r\n    font-weight: 700;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-figure-note {\r\n    margin: 10px 18px 18px;\r\n    padding: 12px 14px;\r\n    border-left: 4px solid var(--xt-primary);\r\n    background: #ffffff;\r\n    color: #455a64;\r\n    border-radius: 0 12px 12px 0;\r\n    font-size: 0.95rem;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-figure-note p {\r\n    margin: 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-figure-note strong {\r\n    color: #17324d;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-table-wrap {\r\n    margin: 22px 0;\r\n    overflow-x: auto;\r\n    border: 1px solid var(--xt-border);\r\n    border-radius: 18px;\r\n    background: #ffffff;\r\n    -webkit-overflow-scrolling: touch;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-table {\r\n    width: 100%;\r\n    min-width: 860px;\r\n    border-collapse: collapse;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-table th,\r\n  .xtmim-rfq-guide .xtmim-table td {\r\n    padding: 14px 16px;\r\n    text-align: left;\r\n    vertical-align: top;\r\n    border-bottom: 1px solid #e5edf3;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-table th {\r\n    background: var(--xt-primary-soft);\r\n    color: #17324d;\r\n    font-weight: 800;\r\n    line-height: 1.35;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-table tr:last-child td {\r\n    border-bottom: 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-table td {\r\n    color: #34495a;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-checklist {\r\n    display: grid;\r\n    grid-template-columns: repeat(2, minmax(0, 1fr));\r\n    gap: 10px 18px;\r\n    margin: 18px 0 0;\r\n    padding: 0;\r\n    list-style: none;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-checklist li {\r\n    position: relative;\r\n    margin: 0;\r\n    padding: 10px 12px 10px 34px;\r\n    border: 1px solid #dce8f1;\r\n    border-radius: 12px;\r\n    background: #ffffff;\r\n    color: #31475a;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-checklist li::before {\r\n    content: \"\u2713\";\r\n    position: absolute;\r\n    left: 12px;\r\n    top: 9px;\r\n    color: var(--xt-primary);\r\n    font-weight: 800;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-scenario {\r\n    margin: 22px 0;\r\n    padding: 20px;\r\n    border-radius: 18px;\r\n    background: #f8fbfe;\r\n    border: 1px solid #d7e6f2;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-scenario h3 {\r\n    margin-top: 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-scenario dl {\r\n    margin: 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-scenario dt {\r\n    margin: 14px 0 5px;\r\n    color: #17324d;\r\n    font-weight: 800;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-scenario dd {\r\n    margin: 0;\r\n    color: #405463;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-path-note {\r\n    margin: 22px 0 0;\r\n    padding: 16px 18px;\r\n    border-radius: 16px;\r\n    background: #ffffff;\r\n    border: 1px solid #dce8f1;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-path-note strong {\r\n    color: #17324d;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-cta {\r\n    margin: 34px 0;\r\n    padding: clamp(24px, 3.2vw, 40px);\r\n    border-radius: 24px;\r\n    background: linear-gradient(135deg, #17324d 0%, #245c86 100%);\r\n    color: #ffffff;\r\n    box-shadow: var(--xt-shadow-md);\r\n    scroll-margin-top: 90px;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-cta h2 {\r\n    color: #ffffff;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-cta p {\r\n    color: rgba(255, 255, 255, 0.9);\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-cta-actions {\r\n    display: flex;\r\n    flex-wrap: wrap;\r\n    gap: 12px;\r\n    margin-top: 22px;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-btn {\r\n    display: inline-flex;\r\n    align-items: center;\r\n    justify-content: center;\r\n    min-height: 44px;\r\n    padding: 11px 18px;\r\n    border-radius: 999px;\r\n    font-weight: 800;\r\n    border: 1px solid rgba(255, 255, 255, 0.35) !important;\r\n    text-decoration: none;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-btn-primary {\r\n    background: #ffffff;\r\n    color: #17324d !important;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-btn-secondary {\r\n    background: rgba(255, 255, 255, 0.1);\r\n    color: #ffffff !important;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-faq details {\r\n    margin: 12px 0;\r\n    border: 1px solid var(--xt-border);\r\n    border-radius: 14px;\r\n    background: #ffffff;\r\n    overflow: hidden;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-faq summary {\r\n    cursor: pointer;\r\n    padding: 16px 18px;\r\n    color: #17324d;\r\n    font-weight: 800;\r\n    min-height: 48px;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-faq details p {\r\n    padding: 0 18px 18px;\r\n    margin: 0;\r\n    color: #405463;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-author,\r\n  .xtmim-rfq-guide .xtmim-standards {\r\n    padding: 20px;\r\n    border-radius: 18px;\r\n    border: 1px solid var(--xt-border);\r\n    background: var(--xt-bg-soft);\r\n    margin: 24px 0;\r\n  }\r\n\r\n  .xtmim-rfq-guide .xtmim-author strong,\r\n  .xtmim-rfq-guide .xtmim-standards strong {\r\n    color: #17324d;\r\n  }\r\n\r\n  @media (max-width: 900px) {\r\n    .xtmim-rfq-guide {\r\n      padding-left: 16px;\r\n      padding-right: 16px;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-summary-grid,\r\n    .xtmim-rfq-guide .xtmim-grid-2,\r\n    .xtmim-rfq-guide .xtmim-grid-3,\r\n    .xtmim-rfq-guide .xtmim-checklist,\r\n    .xtmim-rfq-guide .xtmim-toc ul {\r\n      grid-template-columns: 1fr;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-section,\r\n    .xtmim-rfq-guide .xtmim-summary {\r\n      padding: 22px 16px;\r\n    }\r\n  }\r\n\r\n  @media (max-width: 600px) {\r\n    .xtmim-rfq-guide {\r\n      padding: 0 16px 42px;\r\n      font-size: 15.5px;\r\n      line-height: 1.68;\r\n    }\r\n\r\n    .xtmim-rfq-guide h2 {\r\n      font-size: 25px;\r\n      line-height: 1.28;\r\n    }\r\n\r\n    .xtmim-rfq-guide h3 {\r\n      font-size: 20px;\r\n      line-height: 1.34;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-intro {\r\n      padding: 20px 16px;\r\n      border-radius: 18px;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-intro p {\r\n      font-size: 16px;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-hero,\r\n    .xtmim-rfq-guide .xtmim-figure,\r\n    .xtmim-rfq-guide .xtmim-section,\r\n    .xtmim-rfq-guide .xtmim-summary,\r\n    .xtmim-rfq-guide .xtmim-cta {\r\n      border-radius: 16px;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-table {\r\n      min-width: 780px;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-cta-actions {\r\n      display: grid;\r\n    }\r\n\r\n    .xtmim-rfq-guide .xtmim-btn {\r\n      width: 100%;\r\n      text-align: center;\r\n    }\r\n  }\r\n<\/style>\r\n\r\n<article class=\"xtmim-rfq-guide\">\r\n\r\n\r\n  <section class=\"xtmim-intro\" id=\"overview\">\r\n    <div class=\"xtmim-eyebrow\">Engineering RFQ Preparation Guide<\/div>\r\n    <p>\r\n      A useful MIM RFQ package should include a controlled 2D drawing, a matching 3D CAD file, material grade or performance target, critical tolerance notes, annual volume expectations, surface finish requirements, secondary operation needs, inspection expectations, and application background. These inputs allow the engineering team to review whether the part fits the <a href=\"https:\/\/xtmim.com\/metal-injection-molding\/\">metal injection molding<\/a> route, where tooling risk may occur, which dimensions may need secondary machining, and what assumptions should be included in the quotation scope. This matters because MIM uses fine metal powder feedstock, injection molding, green part handling, debinding, sintering shrinkage, tooling compensation, and final dimensional control. When key information is missing, suppliers may quote different assumptions, making price comparison unreliable.\r\n    <\/p>\r\n    <p>\r\n      Use this guide before submitting a quote request, sending drawings for review, or discussing an OEM\/ODM project. The goal is not to make the inquiry longer. The goal is to make the engineering assumptions clear enough for a more useful manufacturability review and quotation discussion.\r\n    <\/p>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-summary\" id=\"engineering-summary\">\r\n    <h2>Quick Answer: Minimum MIM RFQ Package<\/h2>\r\n    <div class=\"xtmim-summary-grid\">\r\n      <div>\r\n        <p>\r\n          For most small complex MIM parts, the minimum RFQ package should answer six questions: what is the part shape, what must it do, what material or performance is required, which dimensions are critical, how many parts are expected, and how the finished part should be accepted.\r\n        <\/p>\r\n        <ul class=\"xtmim-summary-list\">\r\n          <li>Latest 2D drawing with revision control, tolerances, datums, material notes, and inspection notes<\/li>\r\n          <li>Matching 3D CAD file such as STEP, Parasolid, or native CAD format<\/li>\r\n          <li>Material grade, material family, or performance target<\/li>\r\n          <li>Critical-to-quality dimensions, mating surfaces, sealing faces, and cosmetic surfaces<\/li>\r\n          <li>Prototype quantity, pilot quantity, estimated annual volume, and expected program life<\/li>\r\n          <li>Surface finish, secondary operation, heat treatment, coating, or PVD requirements if applicable<\/li>\r\n          <li>Application background, working conditions, assembly function, and inspection requirements<\/li>\r\n        <\/ul>\r\n      <\/div>\r\n      <div class=\"xtmim-summary-callout\">\r\n        <strong>Engineering judgment<\/strong>\r\n        <p>\r\n          If the project only has a concept model, use drawing review first. If the drawing, CAD file, material direction, tolerances, volume, and delivered condition are already defined, use the quote request path. For multi-part or long-term development programs, use the OEM\/ODM inquiry path.\r\n        <\/p>\r\n      <\/div>\r\n    <\/div>\r\n  <\/section>\r\n\r\n  <nav class=\"xtmim-toc\" aria-label=\"Page sections\">\r\n    <strong>Page sections<\/strong>\r\n    <ul>\r\n      <li><a href=\"#engineering-summary\">Quick answer<\/a><\/li>\r\n      <li><a href=\"#rfq-package\">What to include in a MIM RFQ package<\/a><\/li>\r\n      <li><a href=\"#submission-path\">Choose the right XTMIM submission path<\/a><\/li>\r\n      <li><a href=\"#minimum-package\">Minimum RFQ package<\/a><\/li>\r\n      <li><a href=\"#missing-inputs\">Missing information and quotation risk<\/a><\/li>\r\n      <li><a href=\"#input-details\">What each RFQ input should include<\/a><\/li>\r\n      <li><a href=\"#review-process\">How XTMIM reviews your RFQ package<\/a><\/li>\r\n      <li><a href=\"#mistakes\">Common RFQ mistakes<\/a><\/li>\r\n      <li><a href=\"#submit-checklist\">Before you submit checklist<\/a><\/li>\r\n      <li><a href=\"#send-package\">Send your RFQ package<\/a><\/li>\r\n      <li><a href=\"#faq\">FAQ<\/a><\/li>\r\n    <\/ul>\r\n  <\/nav>\r\n\r\n  <section class=\"xtmim-section xtmim-soft\" id=\"rfq-package\">\r\n    <h2>What Should Be Included in a MIM RFQ Package?<\/h2>\r\n    <p>\r\n      A MIM RFQ package should provide enough technical and commercial information for the supplier to evaluate process suitability, tooling risk, material direction, tolerance strategy, post-processing needs, inspection scope, and production economics. In practice, a supplier cannot judge a small complex part from geometry alone. The drawing must also define what is functional, what is cosmetic, what must be measured, and what delivered condition is expected.\r\n    <\/p>\r\n\r\n    <div class=\"xtmim-grid xtmim-grid-3\">\r\n      <div class=\"xtmim-card\">\r\n        <strong>Minimum technical package<\/strong>\r\n        <p>Send the latest 2D drawing, matching 3D CAD file, material grade or performance requirement, critical tolerances, functional surfaces, and surface finish expectations.<\/p>\r\n      <\/div>\r\n      <div class=\"xtmim-card\">\r\n        <strong>Production and project information<\/strong>\r\n        <p>Provide prototype quantity, pilot quantity, estimated annual volume, target timeline, and current project stage. MIM usually requires tooling and process development, so quantity and program maturity affect quotation assumptions.<\/p>\r\n      <\/div>\r\n      <div class=\"xtmim-card\">\r\n        <strong>Engineering risk information<\/strong>\r\n        <p>Mark thin walls, small holes, slots, undercuts, mating faces, sealing faces, cosmetic surfaces, and dimensions that may require machining after sintering.<\/p>\r\n      <\/div>\r\n    <\/div>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section\" id=\"submission-path\">\r\n    <h2>Choose the Right XTMIM Submission Path<\/h2>\r\n    <p>\r\n      XTMIM separates different contact paths so buyers can send the right type of information at the right stage. Use this page as the preparation step before choosing a submission action. If your drawings and requirements are complete, move to quotation. If the part still needs geometry, tolerance, material, or manufacturability review, use drawing review first.\r\n    <\/p>\r\n\r\n    <figure class=\"xtmim-figure\">\r\n      <img loading=\"lazy\" decoding=\"async\"\r\n        src=\"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/06-xtmim-rfq-submission-paths.webp\"\r\n        alt=\"RFQ submission path selection for contact, quotation, drawing review, OEM project inquiry, and RFQ preparation\"\r\n        title=\"XTMIM RFQ Submission Paths\"\r\n        width=\"1672\"\r\n        height=\"941\"\r\n        loading=\"lazy\"\r\n      \/>\r\n      <figcaption>XTMIM RFQ submission path selection.<\/figcaption>\r\n      <div class=\"xtmim-figure-note\">\r\n        <p><strong>Core conclusion:<\/strong> Different project stages should use different contact paths. General questions, formal quotations, drawing review, and OEM\/ODM projects should not be mixed into one unclear inquiry.<\/p>\r\n      <\/div>\r\n    <\/figure>\r\n\r\n    <div class=\"xtmim-grid xtmim-grid-2\">\r\n      <div class=\"xtmim-path-card\">\r\n        <strong>Contact Us<\/strong>\r\n        <p>Use this path when you have a general question about XTMIM, MIM capability, materials, production scope, or whether your project may be suitable for MIM.<\/p>\r\n        <a href=\"https:\/\/xtmim.com\/contact-us\/\">Go to Contact Us<\/a>\r\n      <\/div>\r\n      <div class=\"xtmim-path-card\">\r\n        <strong>Request a Quote<\/strong>\r\n        <p>Use this path when you already have a relatively complete RFQ package, including drawings, material requirements, volume expectations, surface or inspection requirements, and project background.<\/p>\r\n        <a href=\"https:\/\/xtmim.com\/request-a-quote\/\">Go to Request a Quote<\/a>\r\n      <\/div>\r\n      <div class=\"xtmim-path-card\">\r\n        <strong>Submit Drawing for Review<\/strong>\r\n        <p>Use this path when your drawing is available, but you are not sure whether the part is suitable for MIM, whether the structure has manufacturability risks, or whether some features may require design adjustment or secondary machining.<\/p>\r\n        <a href=\"https:\/\/xtmim.com\/submit-drawing-for-review\/\">Submit Drawing for Review<\/a>\r\n      <\/div>\r\n      <div class=\"xtmim-path-card\">\r\n        <strong>OEM\/ODM Project Inquiry<\/strong>\r\n        <p>Use this path for multi-part projects, long-term development programs, private-label cooperation, custom assemblies, or projects that may require several rounds of engineering communication before quotation.<\/p>\r\n        <a href=\"https:\/\/xtmim.com\/oem-odm-project-inquiry\/\">Go to OEM\/ODM Project Inquiry<\/a>\r\n      <\/div>\r\n      <div class=\"xtmim-path-card\">\r\n        <strong>RFQ Preparation Guide<\/strong>\r\n        <p>You are on the preparation page. Use the checklist below to organize drawings, materials, tolerances, quantity, inspection scope, and project background before submission.<\/p>\r\n        <a href=\"https:\/\/xtmim.com\/rfq-preparation-guide\/#submit-checklist\">Review the submission checklist<\/a>\r\n      <\/div>\r\n      <div class=\"xtmim-path-card\">\r\n        <strong>Not sure which path fits?<\/strong>\r\n        <p>Start with Contact Us and include your drawing status, material question, annual volume estimate, and project stage. XTMIM can guide the next step without forcing the project into a premature quotation path.<\/p>\r\n        <a href=\"https:\/\/xtmim.com\/contact-us\/\">Ask XTMIM which path fits<\/a>\r\n      <\/div>\r\n    <\/div>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section xtmim-soft\" id=\"minimum-package\">\r\n    <h2>Minimum RFQ Package for Small Complex MIM Parts<\/h2>\r\n    <p>\r\n      A complete RFQ package does not need to be complicated, but it should remove the most common technical uncertainties. For small complex MIM parts, the supplier usually needs to understand shape, function, material direction, process limits, critical dimensions, and production expectations before giving a meaningful quotation direction.\r\n    <\/p>\r\n\r\n    <figure class=\"xtmim-figure\">\r\n      <img loading=\"lazy\" decoding=\"async\"\r\n        src=\"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/02-minimum-mim-rfq-package.webp\"\r\n        alt=\"Engineering layout showing drawing, CAD file, material information, volume planning, and small MIM parts for RFQ preparation\"\r\n        title=\"Minimum RFQ Package for MIM Parts\"\r\n        width=\"1536\"\r\n        height=\"1024\"\r\n        loading=\"lazy\"\r\n      \/>\r\n      <figcaption>Minimum RFQ package for small complex MIM parts.<\/figcaption>\r\n      <div class=\"xtmim-figure-note\">\r\n        <p><strong>Core conclusion:<\/strong> A useful MIM RFQ package connects geometry, drawing requirements, material direction, production quantity, and quotation assumptions before a supplier can give a meaningful engineering response.<\/p>\r\n      <\/div>\r\n    <\/figure>\r\n\r\n    <div class=\"xtmim-table-wrap\">\r\n      <table class=\"xtmim-table\">\r\n        <thead>\r\n          <tr>\r\n            <th>RFQ Input<\/th>\r\n            <th>What to Prepare<\/th>\r\n            <th>Why It Matters<\/th>\r\n          <\/tr>\r\n        <\/thead>\r\n        <tbody>\r\n          <tr>\r\n            <td>2D drawing<\/td>\r\n            <td>PDF drawing with revision, dimensions, tolerances, datums, material notes, surface notes, and inspection notes.<\/td>\r\n            <td>Defines what must be controlled and measured. It is the main reference for quotation scope and acceptance review.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>3D CAD file<\/td>\r\n            <td>STEP, Parasolid, SolidWorks, or another usable 3D model that matches the drawing revision.<\/td>\r\n            <td>Helps review geometry, wall thickness, undercuts, parting direction, moldability, and sintering distortion risk.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Material requirement<\/td>\r\n            <td>Exact material grade, standard requirement, or performance target.<\/td>\r\n            <td>Affects feedstock selection, sintering route, heat treatment, corrosion resistance, hardness, strength, magnetic behavior, and cost.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Critical tolerances<\/td>\r\n            <td>CTQ dimensions, mating features, datum surfaces, functional holes, sealing faces, and assembly interfaces.<\/td>\r\n            <td>Helps separate as-sintered dimensions from features that may require machining, tooling correction, or tighter inspection.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Annual volume<\/td>\r\n            <td>Prototype quantity, pilot quantity, estimated annual production, and expected program life.<\/td>\r\n            <td>Affects tooling economics, quotation assumptions, production planning, and unit cost direction.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Surface finish<\/td>\r\n            <td>Cosmetic surfaces, functional surfaces, polishing, passivation, coating, PVD, or appearance expectations.<\/td>\r\n            <td>Affects gate and parting line review, finishing scope, acceptance criteria, and cost.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Secondary operations<\/td>\r\n            <td>Machining, tapping, reaming, heat treatment, polishing, coating, or other post-sintering processes.<\/td>\r\n            <td>Defines the delivered condition and prevents the quote from excluding required finishing work.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Inspection requirement<\/td>\r\n            <td>CMM report, first article inspection, hardness check, material report, functional gauge, or visual inspection requirement.<\/td>\r\n            <td>Affects inspection planning, approval process, reporting cost, and lead time.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Application background<\/td>\r\n            <td>Load, wear, motion, corrosion, temperature, assembly method, working environment, and failure concern.<\/td>\r\n            <td>Helps the engineering team review material direction, geometry risk, process suitability, and delivered-condition requirements.<\/td>\r\n          <\/tr>\r\n        <\/tbody>\r\n      <\/table>\r\n    <\/div>\r\n\r\n    <p>\r\n      A 3D CAD file shows the part shape, but it does not replace the 2D drawing. The 2D drawing defines what must be controlled, which dimensions are critical, what material is expected, and how the finished part should be inspected. If the CAD and drawing are not the same revision, the quotation may be based on the wrong geometry or tolerance scheme.\r\n    <\/p>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section\" id=\"missing-inputs\">\r\n    <h2>How Missing RFQ Inputs Change Quotation Assumptions<\/h2>\r\n    <p>\r\n      Incomplete RFQ information does not only slow down communication. It can also cause suppliers to quote different manufacturing scopes. From a purchasing perspective, those quotes may look comparable. From an engineering perspective, they may describe different delivered parts.\r\n    <\/p>\r\n\r\n    <div class=\"xtmim-table-wrap\">\r\n      <table class=\"xtmim-table\">\r\n        <thead>\r\n          <tr>\r\n            <th>Missing RFQ Input<\/th>\r\n            <th>Likely Quotation Risk<\/th>\r\n            <th>Recommended Fix Before Submission<\/th>\r\n          <\/tr>\r\n        <\/thead>\r\n        <tbody>\r\n          <tr>\r\n            <td>No 2D drawing<\/td>\r\n            <td>Supplier may miss CTQ dimensions, datums, threads, surface notes, material notes, or inspection criteria.<\/td>\r\n            <td>Send a controlled PDF drawing with revision level and the latest requirement notes.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No matching 3D CAD file<\/td>\r\n            <td>Geometry review may miss undercuts, thin walls, blind features, mold direction risks, or local distortion risks.<\/td>\r\n            <td>Send STEP, Parasolid, or another usable CAD file matching the latest drawing.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No material requirement<\/td>\r\n            <td>Supplier may assume the wrong alloy system, heat treatment condition, corrosion level, hardness target, or magnetic behavior.<\/td>\r\n            <td>Provide the exact grade or describe performance requirements and working conditions.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No annual volume<\/td>\r\n            <td>Tooling strategy, cavity planning, amortization, and production economics may be unclear.<\/td>\r\n            <td>Separate prototype quantity, pilot quantity, annual volume, and expected program life.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No critical tolerance marking<\/td>\r\n            <td>Quote may exclude machining, tight inspection, or additional process control needed for functional features.<\/td>\r\n            <td>Mark CTQ dimensions, datum features, mating interfaces, and function-critical holes or surfaces.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No surface requirement<\/td>\r\n            <td>Gate mark, parting line, polishing, coating, PVD, or cosmetic expectations may not be included.<\/td>\r\n            <td>Mark visible, sealing, sliding, and mating surfaces before quotation.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No inspection requirement<\/td>\r\n            <td>CMM, FAI, hardness, material report, or functional checks may be excluded from the quotation scope.<\/td>\r\n            <td>Define inspection scope, report expectations, and approval requirements.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No application background<\/td>\r\n            <td>Material, process, tolerance, or surface decisions may be made without understanding real working conditions.<\/td>\r\n            <td>Explain load, wear, corrosion, motion, temperature, assembly context, and failure concerns.<\/td>\r\n          <\/tr>\r\n        <\/tbody>\r\n      <\/table>\r\n    <\/div>\r\n\r\n    <p>\r\n      A reliable RFQ should make the supplier\u2019s assumptions visible. If two quotations are based on different material, machining, inspection, or finishing assumptions, the lower price may not represent the same manufacturing scope.\r\n    <\/p>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section xtmim-soft\" id=\"input-details\">\r\n    <h2>What Each RFQ Input Should Include<\/h2>\r\n\r\n    <h3>2D Drawing and 3D CAD File<\/h3>\r\n    <p>\r\n      For a MIM quotation, the 2D drawing and 3D CAD file should be used together. The 3D CAD file helps review shape, wall thickness, undercuts, slots, holes, parting direction, mold action, and possible sintering distortion. The 2D drawing defines dimensions, tolerances, datums, material notes, surface notes, inspection requirements, and revision status.\r\n    <\/p>\r\n    <p>\r\n      If only a STEP file is provided, XTMIM can perform an initial feasibility discussion, but the quotation may still require drawing clarification before tooling or production planning. For drawing-first communication, use <a href=\"https:\/\/xtmim.com\/submit-drawing-for-review\/\">Submit Drawing for Review<\/a>.\r\n    <\/p>\r\n\r\n    <h3>Material or Performance Requirement<\/h3>\r\n    <p>\r\n      If the material has already been specified, include the exact grade or standard requirement in the RFQ package. This is important when the part must meet strength, hardness, corrosion resistance, magnetic behavior, wear resistance, temperature, or customer-approved documentation requirements.\r\n    <\/p>\r\n    <p>\r\n      If the material is not finalized, provide the performance requirements instead. Useful information includes working environment, contact fluids, corrosion exposure, wear condition, mechanical load, hardness target, magnetic requirement, temperature range, and surface treatment expectation. For broader material direction, review <a href=\"https:\/\/xtmim.com\/mim-materials\/\">MIM materials<\/a>.\r\n    <\/p>\r\n\r\n    <h3>Critical Tolerances and Functional Surfaces<\/h3>\r\n    <p>\r\n      Not every dimension needs the same level of control. In MIM quotation, the most useful drawing clearly separates general dimensions from critical-to-quality dimensions. Before tooling, the key question is which features control fit, assembly, movement, sealing, alignment, or load transfer.\r\n    <\/p>\r\n\r\n    <figure class=\"xtmim-figure\">\r\n      <img loading=\"lazy\" decoding=\"async\"\r\n        src=\"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/03-small-complex-mim-part-geometry-review.webp\"\r\n        alt=\"Close-up of small complex MIM metal parts with holes, slots, thin sections, and functional surfaces for quotation review\"\r\n        title=\"Small Complex MIM Part Geometry Review\"\r\n        width=\"1536\"\r\n        height=\"1024\"\r\n        loading=\"lazy\"\r\n      \/>\r\n      <figcaption>Small complex MIM part features that should be identified before quotation.<\/figcaption>\r\n      <div class=\"xtmim-figure-note\">\r\n        <p><strong>Core conclusion:<\/strong> Small part size does not mean simple quotation. Critical surfaces, holes, slots, thin sections, and measurement access can change tooling, secondary operation, and inspection assumptions.<\/p>\r\n      <\/div>\r\n    <\/figure>\r\n\r\n    <p>\r\n      Mark features that affect assembly, sealing, rotation, sliding, alignment, press fit, load transfer, or functional movement. Also mark cosmetic surfaces, mating surfaces, sealing faces, visible surfaces, and surfaces where gate marks, parting lines, or ejector marks may be unacceptable.\r\n    <\/p>\r\n    <p>\r\n      This helps the supplier judge whether the part can remain as-sintered or whether certain features need machining, grinding, polishing, or additional inspection after sintering. For deeper tolerance guidance, review <a href=\"https:\/\/xtmim.com\/mim-design-guide\/mim-tolerances\/\">MIM tolerances<\/a>.\r\n    <\/p>\r\n\r\n    <h3>Annual Volume and Project Stage<\/h3>\r\n    <p>\r\n      MIM typically involves tooling, sampling, process tuning, and production validation. Therefore, the quotation depends not only on the part design, but also on project stage and production volume. Prototype quantity, pilot quantity, and annual production demand should not be merged into one vague number.\r\n    <\/p>\r\n\r\n    <figure class=\"xtmim-figure\">\r\n      <img loading=\"lazy\" decoding=\"async\"\r\n        src=\"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/04-mim-program-stage-rfq-quantity-planning.webp\"\r\n        alt=\"Prototype, pilot, and production stage layout showing how quantity planning affects MIM quotation review\"\r\n        title=\"MIM Program Stage and RFQ Quantity Planning\"\r\n        width=\"1672\"\r\n        height=\"941\"\r\n        loading=\"lazy\"\r\n      \/>\r\n      <figcaption>Prototype, pilot, and production quantity planning for MIM quotation.<\/figcaption>\r\n      <div class=\"xtmim-figure-note\">\r\n        <p><strong>Core conclusion:<\/strong> Prototype quantity, pilot demand, and annual production volume should be separated because they support different tooling, cost, and production planning assumptions.<\/p>\r\n      <\/div>\r\n    <\/figure>\r\n\r\n    <p>\r\n      Separate the quantity information into prototype quantity, pilot or trial quantity, estimated annual volume, expected program life, and batch size or delivery frequency if known. Prototype quantity alone is not enough to judge MIM production economics. A part may be technically suitable for MIM, but the tooling investment must still make sense for the expected production volume.\r\n    <\/p>\r\n\r\n    <h3>Secondary Operations and Inspection Scope<\/h3>\r\n    <p>\r\n      The as-sintered MIM part may not be the final delivered condition. Some features may require machining, tapping, reaming, polishing, passivation, heat treatment, coating, or PVD depending on material, tolerance, surface, and application requirements.\r\n    <\/p>\r\n\r\n    <figure class=\"xtmim-figure\">\r\n      <img loading=\"lazy\" decoding=\"async\"\r\n        src=\"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/05-mim-part-inspection-quotation-scope.webp\"\r\n        alt=\"Inspection scene with small MIM parts, technical drawing, measurement equipment, and CMM for quotation scope review\"\r\n        title=\"MIM Part Inspection for Quotation Scope Review\"\r\n        width=\"1672\"\r\n        height=\"941\"\r\n        loading=\"lazy\"\r\n      \/>\r\n      <figcaption>Inspection and quotation scope review for small complex MIM parts before production quotation.<\/figcaption>\r\n      <div class=\"xtmim-figure-note\">\r\n        <p><strong>Core conclusion:<\/strong> Inspection reports, critical dimensions, secondary operations, and delivered condition should be clarified before comparing MIM quotations.<\/p>\r\n      <\/div>\r\n    <\/figure>\r\n\r\n    <p>\r\n      Inspection scope should also be defined before quotation. Some projects only need key dimensional checks. Others may require CMM reports, first article inspection, hardness checks, material reports, visual inspection, functional gauges, or customer-specific approval documentation.\r\n    <\/p>\r\n    <p>\r\n      For related capabilities, review <a href=\"https:\/\/xtmim.com\/capabilities\/\">XTMIM capabilities<\/a>, <a href=\"https:\/\/xtmim.com\/capabilities\/inspection-testing\/\">inspection and testing<\/a>, and <a href=\"https:\/\/xtmim.com\/capabilities\/quality-control\/\">quality control<\/a>.\r\n    <\/p>\r\n\r\n    <h3>Application Background<\/h3>\r\n    <p>\r\n      Application background helps the engineering team understand why the part is designed this way and what risks should be reviewed before quotation. Useful background information includes product application, assembly function, load condition, wear or friction condition, corrosion environment, working temperature, motion or sliding requirement, cosmetic requirement, failure concern, and any replacement process such as CNC, casting, stamping, or plastic injection molding with metal insert.\r\n    <\/p>\r\n    <p>\r\n      This information helps XTMIM review whether MIM is suitable, which material direction may be reasonable, which features may need adjustment, and which quotation assumptions should be clarified early.\r\n    <\/p>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section\" id=\"review-process\">\r\n    <h2>How XTMIM Reviews Your RFQ Package<\/h2>\r\n    <p>\r\n      After receiving your RFQ package, XTMIM reviews the project from an engineering and production perspective before quotation assumptions are finalized. The review is not only a price check. It is an early filter for MIM suitability, tooling risk, material direction, tolerance strategy, secondary operations, and inspection scope.\r\n    <\/p>\r\n\r\n    <div class=\"xtmim-grid xtmim-grid-3\">\r\n      <div class=\"xtmim-card\">\r\n        <strong>MIM suitability<\/strong>\r\n        <p>Review whether the part geometry, volume, material direction, and functional requirements fit the metal injection molding route.<\/p>\r\n      <\/div>\r\n      <div class=\"xtmim-card\">\r\n        <strong>Geometry and tooling risk<\/strong>\r\n        <p>Review wall thickness, holes, slots, undercuts, mold direction, gate location risk, green part handling, and features that may need design adjustment.<\/p>\r\n      <\/div>\r\n      <div class=\"xtmim-card\">\r\n        <strong>Material direction<\/strong>\r\n        <p>Check whether the requested material or performance target is realistic for feedstock selection, debinding, sintering, heat treatment, and final use.<\/p>\r\n      <\/div>\r\n      <div class=\"xtmim-card\">\r\n        <strong>Tolerance strategy<\/strong>\r\n        <p>Review whether critical features can remain as-sintered or may require secondary machining and additional inspection.<\/p>\r\n      <\/div>\r\n      <div class=\"xtmim-card\">\r\n        <strong>Secondary operations<\/strong>\r\n        <p>Clarify machining, heat treatment, polishing, coating, passivation, PVD, or other delivered-condition requirements.<\/p>\r\n      <\/div>\r\n      <div class=\"xtmim-card\">\r\n        <strong>Inspection scope<\/strong>\r\n        <p>Review CMM, FAI, hardness, material reporting, visual inspection, functional gauges, and approval documentation needs.<\/p>\r\n      <\/div>\r\n    <\/div>\r\n\r\n    <p>\r\n      This review does not replace final sample validation or customer approval. It helps identify important questions before tooling, trial production, or production quotation.\r\n    <\/p>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section xtmim-soft\" id=\"mistakes\">\r\n    <h2>Common RFQ Mistakes That Delay Quotation<\/h2>\r\n    <p>\r\n      Several RFQ mistakes can delay the quotation process or lead to unclear pricing. Most delays are not caused by a lack of supplier willingness to quote. They are caused by missing assumptions that affect tooling, material, tolerance, machining, inspection, or delivered condition.\r\n    <\/p>\r\n\r\n    <div class=\"xtmim-table-wrap\">\r\n      <table class=\"xtmim-table\">\r\n        <thead>\r\n          <tr>\r\n            <th>RFQ Mistake<\/th>\r\n            <th>Why It Delays Quotation<\/th>\r\n            <th>Better RFQ Practice<\/th>\r\n          <\/tr>\r\n        <\/thead>\r\n        <tbody>\r\n          <tr>\r\n            <td>Sending only a STEP file<\/td>\r\n            <td>No tolerances, datums, material notes, or inspection criteria are visible.<\/td>\r\n            <td>Send both 2D drawing and 3D CAD file.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Asking for price before defining requirements<\/td>\r\n            <td>Supplier cannot confirm material, tolerance, volume, or delivered condition.<\/td>\r\n            <td>Prepare the minimum RFQ package first.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No annual volume<\/td>\r\n            <td>Tooling economics and production planning cannot be evaluated.<\/td>\r\n            <td>Separate prototype, pilot, and annual quantity.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>All dimensions are tightly toleranced<\/td>\r\n            <td>Quote may include unnecessary machining or inspection.<\/td>\r\n            <td>Mark only function-critical dimensions clearly.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No surface requirement<\/td>\r\n            <td>Gate mark, parting line, polishing, coating, or cosmetic expectations may be unclear.<\/td>\r\n            <td>Mark visible and functional surfaces.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No secondary operation information<\/td>\r\n            <td>Machining, heat treatment, coating, or polishing may be excluded.<\/td>\r\n            <td>Define the delivered condition.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>No inspection expectation<\/td>\r\n            <td>Reports, gauges, CMM checks, or FAI may be excluded.<\/td>\r\n            <td>Define critical inspection and documentation needs.<\/td>\r\n          <\/tr>\r\n          <tr>\r\n            <td>Drawing revision is not controlled<\/td>\r\n            <td>Supplier may quote an outdated geometry or tolerance scheme.<\/td>\r\n            <td>Provide the latest drawing revision and matching CAD file.<\/td>\r\n          <\/tr>\r\n        <\/tbody>\r\n      <\/table>\r\n    <\/div>\r\n\r\n    <div class=\"xtmim-scenario\">\r\n      <h3>Composite field scenario for engineering training: STEP-only RFQ created incompatible quotations<\/h3>\r\n      <dl>\r\n        <dt>What problem occurred<\/dt>\r\n        <dd>A buyer sent only a STEP file for a small locking component and requested prices from several suppliers. The returned quotations were difficult to compare.<\/dd>\r\n\r\n        <dt>Why it happened<\/dt>\r\n        <dd>The STEP file showed the part shape, but it did not define critical tolerances, datum logic, material direction, cosmetic surfaces, inspection reports, or annual volume.<\/dd>\r\n\r\n        <dt>What the real system cause was<\/dt>\r\n        <dd>Each supplier made different assumptions. One assumed all features could remain as-sintered. Another included secondary machining for a pivot hole. A third included additional inspection reports and heat treatment. The buyer was not comparing the same manufacturing scope.<\/dd>\r\n\r\n        <dt>How it was corrected<\/dt>\r\n        <dd>The buyer provided a 2D drawing with critical dimensions, marked the pivot hole and contact face, clarified annual volume, and stated the target material performance.<\/dd>\r\n\r\n        <dt>How to prevent recurrence<\/dt>\r\n        <dd>Use both the 3D file and the controlled 2D drawing. The 3D file shows what the part looks like; the drawing and RFQ notes explain what the part must do and how it should be accepted.<\/dd>\r\n      <\/dl>\r\n    <\/div>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section\" id=\"submit-checklist\">\r\n    <h2>Before You Submit: RFQ Preparation Checklist<\/h2>\r\n    <p>\r\n      Before submitting your RFQ to XTMIM, prepare the following information where available. If some items are still open, mark them clearly instead of leaving them unexplained.\r\n    <\/p>\r\n\r\n    <ul class=\"xtmim-checklist\">\r\n      <li>Current 2D drawing with revision control<\/li>\r\n      <li>Matching 3D CAD file<\/li>\r\n      <li>Material grade or performance requirement<\/li>\r\n      <li>Estimated annual volume<\/li>\r\n      <li>Prototype, pilot, and production quantity expectations<\/li>\r\n      <li>Critical dimensions<\/li>\r\n      <li>Functional surfaces<\/li>\r\n      <li>Cosmetic or visible surfaces<\/li>\r\n      <li>Surface finish requirement<\/li>\r\n      <li>Secondary operation requirement<\/li>\r\n      <li>Heat treatment or coating requirement<\/li>\r\n      <li>Inspection and report requirement<\/li>\r\n      <li>Application background<\/li>\r\n      <li>Working conditions such as load, wear, temperature, corrosion, motion, or assembly constraint<\/li>\r\n      <li>Target timeline<\/li>\r\n      <li>NDA or confidentiality requirement if needed<\/li>\r\n    <\/ul>\r\n\r\n    <div class=\"xtmim-path-note\">\r\n      <p>\r\n        <strong>Project path note:<\/strong> This checklist is intended to improve communication before quotation. If some information is not available yet, you can still contact XTMIM, but please explain which requirements are confirmed and which are still open. For broader pre-project review tools, use the <a href=\"https:\/\/xtmim.com\/resources\/project-checklists\/\">MIM project checklists<\/a>.\r\n      <\/p>\r\n    <\/div>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-cta\" id=\"send-package\">\r\n    <h2>Prepare Your RFQ Package and Send It to XTMIM<\/h2>\r\n    <p>\r\n      If your project involves a small complex metal part with thin walls, small holes, undercuts, functional surfaces, tight tolerances, uncertain material requirements, or unclear inspection expectations, send your project package to XTMIM for engineering review.\r\n    <\/p>\r\n    <p>\r\n      Useful inputs include 2D drawings, 3D CAD files, target material or performance requirements, critical tolerances, surface finish needs, secondary operation expectations, estimated annual volume, project stage, and application background. XTMIM can review MIM process suitability, material direction, tooling risk, debinding and sintering shrinkage risk, tolerance strategy, secondary operation needs, and inspection scope before tooling, pilot validation, or production planning.\r\n    <\/p>\r\n    <div class=\"xtmim-cta-actions\">\r\n      <a class=\"xtmim-btn xtmim-btn-primary\" href=\"https:\/\/xtmim.com\/contact-us\/\">Contact XTMIM<\/a>\r\n      <a class=\"xtmim-btn xtmim-btn-secondary\" href=\"https:\/\/xtmim.com\/submit-drawing-for-review\/\">Submit Drawing for Review<\/a>\r\n      <a class=\"xtmim-btn xtmim-btn-secondary\" href=\"https:\/\/xtmim.com\/request-a-quote\/\">Request a Quote<\/a>\r\n      <a class=\"xtmim-btn xtmim-btn-secondary\" href=\"https:\/\/xtmim.com\/oem-odm-project-inquiry\/\">OEM\/ODM Project Inquiry<\/a>\r\n    <\/div>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-section xtmim-faq\" id=\"faq\">\r\n    <h2>FAQ<\/h2>\r\n\r\n    <details>\r\n      <summary>Is a 3D CAD file enough for a MIM quotation?<\/summary>\r\n      <p>A 3D CAD file can support an initial feasibility discussion, but it is usually not enough for a reliable MIM quotation. The supplier also needs a 2D drawing with tolerances, datums, material notes, surface requirements, inspection expectations, and drawing revision control.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>What should I send before requesting a MIM quote?<\/summary>\r\n      <p>You should send the latest 2D drawing, matching 3D CAD file, material grade or performance requirement, estimated annual volume, critical tolerances, surface finish needs, secondary operation requirements, inspection expectations, and application background.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>Do I need to know the exact MIM material before submitting an RFQ?<\/summary>\r\n      <p>Not always. If the material has already been specified, provide the exact grade or specification. If the material is not finalized, provide performance requirements such as strength, hardness, corrosion resistance, wear resistance, magnetic behavior, working temperature, or surface treatment needs.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>What if the annual volume is not finalized yet?<\/summary>\r\n      <p>Provide the best available estimate and separate prototype quantity, pilot quantity, and possible annual production demand. Even a rough volume range helps the supplier judge tooling economics, production planning, and whether MIM is commercially reasonable for the project.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>Can I submit only a sample or an old drawing?<\/summary>\r\n      <p>You can contact XTMIM for an initial discussion, but a reliable quotation usually requires a controlled drawing and CAD file. If only a physical sample or old drawing is available, explain which dimensions, material, function, and delivered condition must be reproduced.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>Should I mark critical tolerances before quotation?<\/summary>\r\n      <p>Yes. Critical tolerances help the supplier understand which dimensions affect fit, assembly, movement, sealing, alignment, or load transfer. This helps determine whether the feature can remain as-sintered or may require machining and additional inspection.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>Should secondary operations be included in the RFQ?<\/summary>\r\n      <p>Yes, if the part requires threads, reaming, flatness, sealing surfaces, bearing surfaces, heat treatment, polishing, coating, PVD, passivation, or tight dimensional control. The supplier should know the expected delivered condition before quotation.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>Which page should I use if I only want drawing review?<\/summary>\r\n      <p>Use the Submit Drawing for Review page if you mainly want engineering feedback on part geometry, MIM suitability, tolerance risk, material direction, or possible manufacturability issues before requesting a formal quotation.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>Which page should I use when I am ready for a formal quotation?<\/summary>\r\n      <p>Use the Request a Quote page when your drawing, CAD file, material direction, tolerance requirements, annual volume, surface finish needs, inspection scope, and project background are already prepared well enough for quotation review.<\/p>\r\n    <\/details>\r\n\r\n    <details>\r\n      <summary>Which page should I use for OEM\/ODM or multi-part projects?<\/summary>\r\n      <p>Use the OEM\/ODM Project Inquiry page if your project involves multiple parts, long-term development, custom project coordination, private-label requirements, or repeated engineering communication before quotation.<\/p>\r\n    <\/details>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-author\" id=\"engineering-review\">\r\n    <p><strong>Reviewed by XTMIM Engineering Team<\/strong><\/p>\r\n    <p>\r\n      This page was prepared for buyers, project managers, and engineers who are preparing RFQ packages for small complex MIM parts. The review focus includes MIM process suitability, material selection, DFM concerns, tooling risk, feedstock molding behavior, green part handling, debinding and sintering shrinkage risk, tolerance definition, secondary operations, inspection requirements, quotation assumptions, and production feasibility.\r\n    <\/p>\r\n    <p>\r\n      Final quotation and manufacturing decisions should be confirmed through project-specific drawing review, material review, supplier quotation review, sample validation, and approval requirements defined by the customer.\r\n    <\/p>\r\n  <\/section>\r\n\r\n  <section class=\"xtmim-standards\" id=\"standards\">\r\n    <p><strong>Standards and technical reference note<\/strong><\/p>\r\n    <p>\r\n      MIM quotation should be based on project-specific engineering review, but recognized technical references can help buyers and engineers communicate material, process, and drawing expectations. Useful references include the <a href=\"https:\/\/www.mimaweb.org\/DesignCenter\/DesigningwithMIM.aspx\" target=\"_blank\" rel=\"nofollow noopener\">MIMA Design Center<\/a> for MIM design and suitability context, the <a href=\"https:\/\/www.mpif.org\/\" target=\"_blank\" rel=\"nofollow noopener\">Metal Powder Industries Federation<\/a> for powder metallurgy and MIM industry standards context, <a href=\"https:\/\/store.astm.org\/b0883-15.html\" target=\"_blank\" rel=\"nofollow noopener\">ASTM B883<\/a> for ferrous MIM material specification context, and <a href=\"https:\/\/www.iso.org\/standard\/7748.html\" target=\"_blank\" rel=\"nofollow noopener\">ISO 2768-1<\/a> when a drawing uses general tolerances.\r\n    <\/p>\r\n    <p>\r\n      These references support communication, but they do not replace project-specific MIM DFM review, material datasheets, supplier process capability, or formal customer requirements.\r\n    <\/p>\r\n  <\/section>\r\n<\/article>\r\n\r\n<script type=\"application\/ld+json\">\r\n{\r\n  \"@context\": \"https:\/\/schema.org\",\r\n  \"@type\": \"BreadcrumbList\",\r\n  \"@id\": \"https:\/\/xtmim.com\/rfq-preparation-guide\/#breadcrumb\",\r\n  \"itemListElement\": [\r\n    {\r\n      \"@type\": \"ListItem\",\r\n      \"position\": 1,\r\n      \"name\": \"Home\",\r\n      \"item\": \"https:\/\/xtmim.com\/\"\r\n    },\r\n    {\r\n      \"@type\": \"ListItem\",\r\n      \"position\": 2,\r\n      \"name\": \"RFQ Preparation Guide\",\r\n      \"item\": \"https:\/\/xtmim.com\/rfq-preparation-guide\/\"\r\n    }\r\n  ]\r\n}\r\n<\/script>\r\n\r\n<script type=\"application\/ld+json\">\r\n{\r\n  \"@context\": \"https:\/\/schema.org\",\r\n  \"@type\": [\r\n    \"TechArticle\",\r\n    \"Article\"\r\n  ],\r\n  \"@id\": \"https:\/\/xtmim.com\/rfq-preparation-guide\/#techarticle\",\r\n  \"mainEntityOfPage\": {\r\n    \"@type\": \"WebPage\",\r\n    \"@id\": \"https:\/\/xtmim.com\/rfq-preparation-guide\/\"\r\n  },\r\n  \"headline\": \"RFQ Preparation Guide for Small Complex MIM Parts\",\r\n  \"alternativeHeadline\": \"Prepare Your MIM RFQ Package Before Submitting Drawings\",\r\n  \"description\": \"Prepare a MIM RFQ package with 2D drawings, 3D CAD files, material requirements, critical tolerances, annual volume, inspection needs, and application background before requesting a quote.\",\r\n  \"image\": [\r\n    \"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/01-mim-rfq-review-hero-background.webp\",\r\n    \"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/02-minimum-mim-rfq-package.webp\",\r\n    \"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/03-small-complex-mim-part-geometry-review.webp\",\r\n    \"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/04-mim-program-stage-rfq-quantity-planning.webp\",\r\n    \"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/05-mim-part-inspection-quotation-scope.webp\",\r\n    \"https:\/\/xtmim.com\/wp-content\/uploads\/2026\/06\/06-xtmim-rfq-submission-paths.webp\"\r\n  ],\r\n  \"author\": {\r\n    \"@type\": \"Organization\",\r\n    \"name\": \"XTMIM Engineering Team\",\r\n    \"url\": \"https:\/\/xtmim.com\/about-us\/\"\r\n  },\r\n  \"publisher\": {\r\n    \"@type\": \"Organization\",\r\n    \"name\": \"XTMIM\",\r\n    \"url\": \"https:\/\/xtmim.com\/\"\r\n  },\r\n  \"articleSection\": \"RFQ Preparation\",\r\n  \"about\": [\r\n    {\r\n      \"@type\": \"Thing\",\r\n      \"name\": \"Metal Injection Molding RFQ\"\r\n    },\r\n    {\r\n      \"@type\": \"Thing\",\r\n      \"name\": \"Small Complex MIM Parts\"\r\n    },\r\n    {\r\n      \"@type\": \"Thing\",\r\n      \"name\": \"MIM Drawing Review\"\r\n    },\r\n    {\r\n      \"@type\": \"Thing\",\r\n      \"name\": \"MIM Quotation Preparation\"\r\n    }\r\n  ],\r\n  \"keywords\": [\r\n    \"MIM RFQ preparation guide\",\r\n    \"MIM RFQ package\",\r\n    \"metal injection molding quote preparation\",\r\n    \"small complex MIM parts\",\r\n    \"MIM drawing review\",\r\n    \"MIM quotation requirements\",\r\n    \"MIM tolerance requirements\",\r\n    \"submit drawing for MIM review\"\r\n  ],\r\n  \"proficiencyLevel\": \"Intermediate\",\r\n  \"dependencies\": \"Project-specific drawing review, material review, tolerance review, secondary operation review, and inspection requirement confirmation are required before final quotation.\",\r\n  \"audience\": [\r\n    {\r\n      \"@type\": \"Audience\",\r\n      \"audienceType\": \"Sourcing Manager\"\r\n    },\r\n    {\r\n      \"@type\": \"Audience\",\r\n      \"audienceType\": \"Project Manager\"\r\n    },\r\n    {\r\n      \"@type\": \"Audience\",\r\n      \"audienceType\": \"Mechanical Engineer\"\r\n    },\r\n    {\r\n      \"@type\": \"Audience\",\r\n      \"audienceType\": \"Design Engineer\"\r\n    },\r\n    {\r\n      \"@type\": \"Audience\",\r\n      \"audienceType\": \"Supplier Quality Engineer\"\r\n    }\r\n  ],\r\n  \"citation\": [\r\n    \"https:\/\/www.mimaweb.org\/DesignCenter\/DesigningwithMIM.aspx\",\r\n    \"https:\/\/www.mpif.org\/\",\r\n    \"https:\/\/store.astm.org\/b0883-15.html\",\r\n    \"https:\/\/www.iso.org\/standard\/7748.html\"\r\n  ]\r\n}\r\n<\/script>\r\n\r\n<script type=\"application\/ld+json\">\r\n{\r\n  \"@context\": \"https:\/\/schema.org\",\r\n  \"@type\": \"FAQPage\",\r\n  \"@id\": \"https:\/\/xtmim.com\/rfq-preparation-guide\/#faq\",\r\n  \"mainEntity\": [\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Is a 3D CAD file enough for a MIM quotation?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"A 3D CAD file can support an initial feasibility discussion, but it is usually not enough for a reliable MIM quotation. The supplier also needs a 2D drawing with tolerances, datums, material notes, surface requirements, inspection expectations, and drawing revision control.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"What should I send before requesting a MIM quote?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"You should send the latest 2D drawing, matching 3D CAD file, material grade or performance requirement, estimated annual volume, critical tolerances, surface finish needs, secondary operation requirements, inspection expectations, and application background.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Do I need to know the exact MIM material before submitting an RFQ?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"Not always. If the material has already been specified, provide the exact grade or specification. If the material is not finalized, provide performance requirements such as strength, hardness, corrosion resistance, wear resistance, magnetic behavior, working temperature, or surface treatment needs.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"What if the annual volume is not finalized yet?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"Provide the best available estimate and separate prototype quantity, pilot quantity, and possible annual production demand. Even a rough volume range helps the supplier judge tooling economics, production planning, and whether MIM is commercially reasonable for the project.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Can I submit only a sample or an old drawing?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"You can contact XTMIM for an initial discussion, but a reliable quotation usually requires a controlled drawing and CAD file. If only a physical sample or old drawing is available, explain which dimensions, material, function, and delivered condition must be reproduced.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Should I mark critical tolerances before quotation?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"Yes. Critical tolerances help the supplier understand which dimensions affect fit, assembly, movement, sealing, alignment, or load transfer. This helps determine whether the feature can remain as-sintered or may require machining and additional inspection.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Should secondary operations be included in the RFQ?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"Yes, if the part requires threads, reaming, flatness, sealing surfaces, bearing surfaces, heat treatment, polishing, coating, PVD, passivation, or tight dimensional control. The supplier should know the expected delivered condition before quotation.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Which page should I use if I only want drawing review?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"Use the Submit Drawing for Review page if you mainly want engineering feedback on part geometry, MIM suitability, tolerance risk, material direction, or possible manufacturability issues before requesting a formal quotation.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Which page should I use when I am ready for a formal quotation?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"Use the Request a Quote page when your drawing, CAD file, material direction, tolerance requirements, annual volume, surface finish needs, inspection scope, and project background are already prepared well enough for quotation review.\"\r\n      }\r\n    },\r\n    {\r\n      \"@type\": \"Question\",\r\n      \"name\": \"Which page should I use for OEM\/ODM or multi-part projects?\",\r\n      \"acceptedAnswer\": {\r\n        \"@type\": \"Answer\",\r\n        \"text\": \"Use the OEM\/ODM Project Inquiry page if your project involves multiple parts, long-term development, custom project coordination, private-label requirements, or repeated engineering communication before quotation.\"\r\n      }\r\n    }\r\n  ]\r\n}\r\n<\/script>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>MIM RFQ Preparation Guide Engineering RFQ Preparation Guide A useful MIM RFQ package should include a controlled 2D drawing, a matching 3D CAD file, material grade or performance target, critical tolerance notes, annual volume expectations, surface finish requirements, secondary operation needs, inspection expectations, and application background. These inputs allow the engineering team to review whether&#8230;<\/p>","protected":false},"author":1,"featured_media":55075,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-55092","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/pages\/55092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/comments?post=55092"}],"version-history":[{"count":5,"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/pages\/55092\/revisions"}],"predecessor-version":[{"id":55097,"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/pages\/55092\/revisions\/55097"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/media\/55075"}],"wp:attachment":[{"href":"https:\/\/xtmim.com\/tr\/wp-json\/wp\/v2\/media?parent=55092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}