金属射出成形(MIM)の見積もりを依頼する

図面、材料要件、年間数量、公差要件、またはアプリケーションの詳細をお知らせください。当社のエンジニアリングチームがお客様のMIMプロジェクトをレビューし、技術的なフィードバックまたは見積もりを提供します。.

MIM MOLD DESIGN & TOOLING ENGINEERING

Metal Injection Molding (MIM) Mold Design Guide

Effective MIM mold design requires careful consideration of part geometry, mold opening direction, parting lines, slides, core pins, shrinkage compensation, and green part ejection. Learn how to select suitable tooling structures, identify mold-related risks, protect critical surfaces, and balance tooling complexity with manufacturing costs to achieve consistent part quality and reliable mass production.

MIM設計ガイド · 金型投資前のツーリングレビュー

Metal injection molding (MIM) mold design defines the tooling structure, cavity and core dimensions, filling system and release conditions needed to manufacture metal parts consistently. Before tooling investment, review mold opening direction, parting line, slides, inserts, core pins, ejection, shut-off, filling and cavity layout against the final drawing. The mold must form a green part that can be released safely and subsequently debound and sintered to meet the finished component requirements. Where a feature complicates molding or release, compare a revised part geometry, additional tooling mechanisms and secondary machining before committing to a mold. Validate the chosen design before mass production.

最適な部品 機械加工、組立、または複数の部品を代替できる、小型で複雑な部品。.
高リスク形状 サイド穴、アンダーカット、深穴、薄いスロット、脆弱なリブ、および保護された表面。.
主要な金型判断 パーティングライン、スライド、インサート、コアピン、エジェクション、シャットオフ、およびキャビティレイアウト。.
金型製作前のレビュー 2D図面、3D CAD、重要寸法、保護された表面、材料、および年間生産量。.
関連設計チェック: これらの要因が充填、取り出し、焼結挙動、または最終寸法に影響を与える場合は、常にゲート位置、肉厚、収縮補償、および公差計画と合わせて金型レイアウトを確認してください。.

What Is MIM Mold Design and What Must It Achieve?

Metal injection molding (MIM) mold design converts the part requirements into a tool that can form and release a repeatable green component. Both MIM and plastic injection molding use related tooling principles, but MIM additionally requires dimensional compensation for debinding and sintering and careful handling of the powder-binder green part.

Designing for Both the Green Part and the Final Sintered Component

Metal-powder feedstock contains a binder system that enables injection. The molded green part must survive removal and handling before debinding and sintering. Its mechanical behavior is not that of the finished metal. The MPIFプロセス概要 explains these stages. Tool dimensions, release conditions and the location of tooling marks therefore need to be considered against the final drawing, not just the green geometry.

What Defines a Successful MIM Mold Design?

A successful design has an achievable filling and release route, protects functional surfaces, provides a workable dimensional compensation strategy and supports repeated production. A single intact green part is not enough: acceptance ultimately depends on the finished component, including any specified secondary operations.

What Part Requirements Determine MIM Mold Design?

Part Geometry and Moldability Constraints

Compare the part drawing and CAD model with the proposed mold geometry. Look for surfaces that block straight withdrawal, thin steel sections between features, deep recesses and restricted tooling access. A narrow slot may be possible to form but leave a fragile insert or an impractical shut-off. Establish which features are function-critical before choosing hardware.

サイド穴、アンダーカット、複雑な金属成形部品に対応する、スライド、インサート、コアピン金型と比較したシンプルなMIM金型。.
サイドホール、アンダーカット、深穴、および狭いフィーチャーは、金型をシンプルなストレートプルレイアウトから遠ざける可能性があり、金型ルートを選択する前にレビューする必要があります。.

Functional Surfaces, Cosmetic Requirements and Critical Dimensions

Mark sealing, sliding, mating, cosmetic and inspection datum surfaces on the MIM drawing. Distinguish forbidden marks from marks that can be accepted or removed later. Specify the condition in which dimensions are measured, such as as-sintered or after machining and finishing.

Material, Production Volume and Post-Processing Requirements

Confirm the feedstock route, expected lifetime quantity, batch requirements and permitted finishing operations. The same geometry may justify a different cavity layout or a different route for a critical hole depending on these inputs.

Drawing or project inputTooling constraintDecision to confirm
Side hole or internal undercutWithdrawal may be blockedFeature direction, required function and permitted changes
Deep blind hole or narrow slotSlender or fragile tool steelDepth, support, access and tolerance
Protected surfaceRestrictions on tooling marksPermitted parting, gate and ejector locations
Critical dimension or datumSensitivity to shrinkage and measurement setupFinal tolerance, machining allowance and inspection basis
Thin wall or boss transitionFilling and release sensitivityGeometry and support conditions
Material and annual volumeCompensation, cavity layout and wearFeedstock, projected demand and maintenance needs

For the full drawing-level review, use the 「MIMのためのDFMガイド」.

How to Determine Mold Opening Direction and Parting Line

Choosing the Mold Opening Direction and Part Retention Side

Compare candidate opening directions by checking which surfaces can withdraw without interference, which details become undercuts, and which half will retain the green part. Retention must be predictable so that the ejection system can act from the intended side. Consider the full withdrawal path, not only the appearance of the split in CAD. Evaluate a straight-pull mold first. A different opening direction may protect a critical surface or eliminate a side action.

Locating the Parting Line Without Compromising Part Function

The parting surface is the interface between separating mold components; its intersection with the molded part defines the parting line, which may leave a visible witness mark. Place it according to part function as well as tooling access. A witness line may be acceptable on a noncritical surface but a raised edge or mismatch can interfere with sealing, sliding, assembly or measurement.

ゲートマーク、エジェクターマーク、シール面、摺動面、化粧面、基準面を示すMIMパーティングラインと保護面マップ。.
保護すべき面は金型設計前に特定し、パーティングライン、ゲート跡、エジェクタ跡が機能や外観に影響を与えないようにする必要があります。.
表面Design consideration
シール面または摺動面Keep the split away where feasible; otherwise agree allowable marks and finishing.
Mating or inspection datumAvoid mismatch or raised material that changes seating or measurement.
外観面Agree visible mark zones before the tool is released.
後加工面Coordinate stock allowance and the final datum before locating the split.

For example, moving a split away from a sealing face may introduce an additional side action. Compare both layouts rather than treating mark avoidance as the only objective. Agree the proposed mark locations on the drawing. For each candidate split, mark the surfaces formed by each mold half and identify critical dimensions that cross the split. When both defining surfaces are formed by the same mold component, their relative position does not depend directly on alignment between separate mold components. When they are formed by different components, include the alignment error in the tolerance budget. The EPMA MIM設計ガイド provides background on parting marks and release geometry.

How Are Mold Cavity and Core Dimensions Designed for MIM Shrinkage?

Establishing Initial Mold Dimensions from Final Part Requirements

Start from the required finished geometry, including any stock left for machining. The tool must produce a green geometry that reaches the intended as-sintered dimensions after processing. Obtain the applicable oversizing factor from the selected feedstock system and clarify how it is defined. BASF Catamold process guidance identifies oversizing as a feedstock-related consideration. A shrinkage percentage and an oversizing factor are not interchangeable without knowing their reference dimensions.

Apply the dimensional strategy to both the cavity and the cores: external dimensions and internal openings need to be assessed against their respective final requirements. Record the intended measurement datums and distinguish dimensions controlled by molding from dimensions finished by machining.

Allowing for Shrinkage Variation and Tool Corrections

A nominal scale factor is only an initial design input. Local geometry, green density distribution, support and sintering conditions can affect final shape. Reserve a practical correction route for critical features where possible; a removable core or insert may be easier to adjust than an integral tool surface. Plan the correction direction before machining the tool. For example, removing steel from a cavity wall can enlarge a molded external feature, whereas reducing a core-pin diameter can reduce the molded hole diameter. The reverse changes may require replacement or rebuilding of the relevant tool component. For critical features, agree which correction direction is practical and where a replaceable insert or core is justified.

Compare cavity measurements, green measurements and sintered measurements before authorizing tool changes. If comparable green geometry and mass are repeatable but final dimensions vary between furnace batches, investigate downstream conditions and green density variation before changing the tool.

Shrinkage allowance: Use the selected feedstock data and sample measurements rather than a universal shrinkage percentage. See MIM焼結収縮補正 および MIM公差 for detailed dimensional planning.

When Are Slides, Core Pins and Inserts Needed in MIM Molds?

Side Actions for Undercuts and Transverse Features

A slide or side core can form a feature that cannot be released along the primary opening direction, provided its own withdrawal path is clear. The mechanism must retract far enough to clear the green part before ejection. Review available travel, tool support and the interface where the side core meets the cavity. Internal undercuts may be particularly difficult in small parts because there is limited space for release mechanisms.

Core Pins and Inserts for Internal or Complex Features

A core pin forms an opening or recess. A through-hole may allow support at both ends; a blind-hole pin is often cantilevered and more sensitive to deflection under feedstock pressure. Review hole depth, diameter, pin rigidity, release and maintenance. As a preliminary design screen, EPMA suggests limiting unsupported blind-hole depth to about twice the core-pin diameter; this is guidance, not a universal tooling limit. The actual feasible depth depends on pin support, feedstock loading, alignment and required tolerance. An insert can localize a difficult or wear-sensitive detail, but its interface must be positioned and fitted to avoid unacceptable witness marks or flash.

フィーチャーCandidate structureConfirm before selection
Axial through holeコアピンSupport, alignment and release
Transverse holeSide core or slideWithdrawal clearance, position and interface
外部アンダーカットSplit cavity or side actionRelease direction and acceptable witness marks
深い止まり穴Supported where feasible or cantilevered coreDeflection, wear and dimensional sensitivity
Narrow or wear-sensitive detail交換可能インサートSteel strength, fit and replacement access

A feature that can be molded may still be more practical to redesign or machine after sintering. Its function must justify the added mechanism. Review 穴、スロット、アンダーカット for feature-level constraints.

How to Design Safe Ejection for MIM Green Parts

Draft, Mold Release and Green Part Strength

The green component must release without being stretched, bent or locally crushed. Draft reduces resistance on surfaces that move relative to the tool, especially around deep cores. Required draft depends on geometry, feedstock, surface condition and acceptable dimensional change. EPMA gives 0.5–2 degrees as a general range where draft is required; the specific angle must be checked against release conditions and functional geometry. Confirm that draft does not compromise functional fits. The part should remain on the intended mold half until ejection.

Ejector Placement and Balanced Force Distribution

Choose ejector contact areas that can carry the release force. Small projections, thin walls, long flat sections and abrupt boss transitions are vulnerable to concentrated ejection loads. A wider supported area or a different ejection method may be preferable to concentrating the force on a small pin. Balance the load around regions of high release resistance rather than simply adding pins symmetrically.

エジェクターピン配置、薄肉サポート、ボス、リブ、変形リスク、保護面領域を示すMIMグリーン部品抜き取りリスク図。.
エジェクション設計は、脱脂・焼結前のMIMグリーンパーツを保護しなければなりません。局所的な応力が割れ、変形、または目に見える跡を引き起こす可能性があるからです。.
Position ejectors where the green part can carry the release load without local damage.

Mark acceptable ejector locations before the layout is fixed. A mark on a sliding or sealing surface can persist into the finished part, so coordinate ejection with parting and gate locations. For flatness-sensitive parts, also assess 焼結サポート.

Ejection trials: Observe repeated release under the intended molding conditions. One successful ejection does not establish stable production.

How to Coordinate Filling, Venting and Thermal Control in MIM Molds

Gate and Runner Layout in Relation to Mold Geometry

The runner and gate must deliver feedstock to the cavity without conflicting with core support, side actions or protected surfaces. Evaluate flow paths around holes and thin sections and the likely meeting points of flow fronts. Feeding thicker sections before thinner regions is a common starting point. Check whether the flow path can create weld lines at loaded features or trap air in a blind recess; the actual gate route must suit the part and feedstock. See MIMゲート設計 for gate-specific decisions.

Venting and Shut-Off Requirements

Vents provide a path for displaced air to leave the cavity. Review likely last-to-fill regions, blind recesses and flow-front meeting locations. Insufficient venting can contribute to incomplete filling or trapped-gas marks; excessive clearance can allow feedstock to escape. Shut-off surfaces serve a different purpose: steel-to-steel interfaces block flow where cavities, cores or moving components meet. They need adequate support, alignment and maintenance access.

Mold Temperature Uniformity and Filling Consistency

The tool must manage heat so that feedstock fills the intended geometry and reaches a suitable state for release. Uneven thermal conditions can change local flow resistance, solidification and release behavior. Review temperature-control access around inserts, deep cores and multiple cavities. Select operating conditions from the actual feedstock guidance and confirm them in trials; do not transfer plastic molding vent dimensions or temperatures without validation.

Gate, vent and cooling layout: A change in gate position may shift the final filling region and therefore the vent location. A slide or insert may also restrict the space available for temperature control. Coordinate these decisions before machining the tool.

How to Design Mold Cavity Layout for Stable Production

Single-Cavity and Multi-Cavity Mold Layouts

A single cavity can simplify initial development and isolate dimensional or release problems. Multiple cavities can increase output per cycle, but require an appropriate injection machine, runner arrangement, clamp capacity and adequate space for cooling and moving mechanisms. A higher cavity count is not automatically a better production solution.

Cavity Consistency, Tool Wear and Maintainability

Design the feeding system so cavities receive comparable filling conditions. A geometrically symmetric runner is a starting point, not proof of balanced flow. During trials, identify parts by cavity and compare green mass, appearance and critical dimensions, then confirm the final sintered results. Averages across cavities can conceal a consistently weak cavity. Compare each cavity under the same molding and downstream conditions before adjusting individual cavity dimensions.

Consider access to core pins, slide interfaces, vents and replaceable inserts. Metal powder can contribute to wear; the maintenance plan should address the actual feedstock and tool materials. A cavity identification method that does not interfere with function can help trace quality changes.

Layout choiceエンジニアリング上の利点検証の焦点
Single cavitySimpler isolation of design and process variablesRelease, dimensions and achievable output
Multiple identical cavitiesPotentially higher output per cycleFill balance, cavity-level repeatability and maintenance
Family mold with different partsMay consolidate tooling for matched demandUnequal fill behavior, demand balance and independent acceptance

Establish which cavity layouts can meet the quality and output requirements before comparing their costs.

How to Identify Mold-Related Defects and Design Risks in MIM Parts

Flash, Mismatch and Unacceptable Tooling Marks

Distinguish an agreed witness line from raised flash or dimensional mismatch. A defect that repeatedly appears at the same split, slide interface or core location warrants a tooling inspection. Check alignment, contact, wear and the actual molding conditions before deciding on repair.

Green Part Damage and Filling-Related Defects

Inspect the green part before debinding to establish when the problem first appears. Damage associated with ejection may be linked to retention, contact area or release resistance; an incomplete feature may instead involve the flow path, venting or feedstock conditions. Compare the defect location across cycles and cavities: a fixed-location defect suggests a local geometry or tooling issue, whereas a change across all cavities may indicate a shared process condition. Neither pattern proves the cause by itself. Preserve cavity identification when comparing samples. If one cavity repeatedly produces the same offset, compare its core or cavity geometry with the other cavities before changing shared molding settings. If the offset first appears after sintering, compare matched green and sintered measurements using consistent datums. Do not authorize steel removal on the basis of a single finished sample.

Distinguishing Mold Design Issues from Process-Related Problems

観察された症状Tooling checksOther checks
Flash at split or slideFit, alignment, shut-off wearInjection pressure and clamp conditions
Hole offsetCore pin support and locationFlow loading and measurement setup
Green cracking or bendingEjector layout, retention and draftRelease temperature and green condition
Incomplete slot or recessGate, vent and local geometryFeedstock condition and molding parameters
Cavity-dependent variationCavity dimensions, runners and thermal balanceHandling and downstream batch history
Sintered-only dimensional changeInitial compensation and green geometryDebinding, furnace conditions and support

Example: Ejector marks on a sliding surface

問題A functional sliding face shows a raised or depressed ejector mark.
確認Compare the mark with ejector contact and drawing restrictions; inspect the green and finished states.
ResponseConfirm acceptable mark zones and review alternate supported ejection locations before changing the tool.

For further guidance on tooling-related defects, see 金型設計がMIM部品の品質に与える影響.

Should You Redesign the Part, Use Complex Tooling or Add Secondary Machining?

When Part Redesign Is the Better Option

If a side hole, undercut or narrow feature is not function-critical in its current form, assess whether a different direction, reduced depth or simplified shape preserves performance. Obtain customer approval for the change before committing to tool design.

When Complex Tooling Is Justified

Use a slide or other moving mechanism when the feature is necessary, it can be formed and released reliably, and the expected production volume and savings justify the tooling and maintenance costs. Confirm that witness marks and dimensional variation remain acceptable.

When Secondary Machining Makes More Sense

If a molded hole would require a fragile core or cannot reliably meet its final tolerance, consider leaving stock for drilling, reaming or another suitable finishing operation. Verify access, fixturing, datum transfer and the effect on total cost. Not every internal feature is accessible for machining.

フィーチャーRedesign optionDirect molding optionSecondary operation option
サイドホールReorient if function permitsSlide or side coreDrill after sintering if accessible
深い止まり穴Reduce depth or use through holeCore pin if adequately supportedMachine to final depth
内部アンダーカットSimplify release geometrySpecial release mechanism if feasibleMachine if access permits
重要基準 (Critical datum)Revise tolerance only with approvalControlled molded geometryFinish selected datum with stock allowance

Example: A side hole inherited from a CNC design

RedesignReorient the hole if its direction is not essential to assembly.
Direct moldingRetain a slide if the feature is necessary and repeated molding is viable.
機械加工Keep a simpler tool and drill the hole after sintering if location, access and cost permit.

Compare only routes that meet the functional and acceptance requirements, then assess their costs at the expected lifetime quantity. For machining considerations, see 焼結後加工.

How Does MIM Mold Design Affect Tooling Cost and Long-Term Part Cost?

Initial Tooling Cost and Mold Complexity

Additional slides, precision inserts, slender cores, difficult shut-offs and more cavities can increase tool engineering, manufacturing and trial effort. They also create interfaces that need periodic inspection. Ask which features drive the quoted tool cost and whether each mechanism is necessary for the required part function.

Balancing Tooling Investment with Lifetime Production Cost

Compare feasible options over the expected number of accepted parts, rather than comparing the tool price alone. Include molding, secondary operations, expected maintenance, inspection and losses from scrap or rework. A more expensive tool may be justified if it eliminates a recurring operation, but only if the projected volume and validated yield support that assumption. For a simplified comparison, divide each option's tooling investment by the expected lifetime quantity of accepted parts, then add its recurring cost per accepted part. Include maintenance and quality losses on a consistent basis without double-counting. If the more expensive mold does not reduce recurring cost per accepted part, increasing volume alone will not recover the extra investment. When a slide-equipped mold costs more upfront but saves money on each accepted part, the additional tooling investment divided by the recurring saving per accepted part gives a simplified break-even quantity. Compare the break-even quantity with realistic lifetime demand rather than the highest sales forecast. This comparison assumes comparable acceptance criteria and consistent treatment of maintenance, scrap and rework.

コスト要因確認すべき質問
Initial tooling and correctionsWhat is included in the tool quotation and trial scope?
Cavity countWhat accepted output can the layout sustain?
Slides and insertsWhat replacement and maintenance work is anticipated?
二次機械加工What recurring cost remains per accepted part?
Quality lossesHow will cavity variation, scrap and rework affect cost?

For a broader cost assessment, see 金属射出成形コスト および コストを考慮したMIM設計.

How Is a MIM Mold Design Validated Before Mass Production?

Pre-Tooling Design Review and Moldability Validation

Review the approved drawing revision against the proposed mold layout before steel is cut. Check opening and release directions, critical dimensions, protected surfaces, feeding, venting and mechanism clearance. Where justified, flow analysis can help investigate filling and balance, provided appropriate feedstock data are available. Simulation is not a substitute for physical trials.

Tool Trials, Sintered Part Validation and Production Repeatability

Inspect green parts first, then inspect parts after debinding, sintering and any specified finishing. Retain cavity and batch identification to distinguish systematic tooling differences from downstream process variation.

XTMIM quality inspection laboratory with inspection workstations and an operator
XTMIM quality inspection laboratory. Mold validation requires measurements of critical features in the specified finished condition, compared with the approved drawing and acceptance criteria.
Validation stageレビュー証拠決定
Tool trialRepeated filling, release, flash and marksIs the green part consistently moldable?
Green inspectionMass, geometry and damage by cavityAre tool and molding conditions repeatable?
Sintered inspectionCritical dimensions, distortion and surface conditionIs compensation appropriate under stable processing?
完成品Functional, assembly and drawing requirementsDoes the delivered condition meet acceptance criteria?
量産Cavity and batch variation, maintenance observationsIs the agreed production route sufficiently stable?

If a requirement fails, establish whether the cause is the tool, molding process, downstream processing or product design before making irreversible changes. Sampling, acceptance criteria and the number of trial iterations must be agreed for the specific project. For a tool correction, record the affected feature and cavity, the measured deviation, the proposed change and the acceptance criterion. Recheck the corrected feature and any linked dimensions or surfaces in the finished condition before closing the correction. A corrected dimension is not sufficient if the same change causes a new assembly or fit problem. See the MIM射出成形プロセス for details of the molding stage.

MIM Mold Design Review Checklist Before Tooling Approval

Critical Decisions to Confirm Before Tooling Release

Prepare the current 2D drawing and 3D CAD file, material and finishing requirements, estimated annual volume, application background and critical dimensions. Use these documents to confirm the following items before authorizing mold manufacture.

レビュー項目Required decision or evidence
図面改訂Approved geometry, material, datums and final acceptance condition
Opening and partingRelease route, retention side and permitted witness lines
Cavity and core dimensionsFeedstock-specific compensation and correction strategy
複雑な形状Agreed slide, core, redesign or machining route
Ejection and protected surfacesSupported contact areas and acceptable marks
Filling and thermal layoutCoordinated gate, vent, shut-off and temperature-control approach
Production layoutCavity count, traceability and maintenance considerations
Validation planTrial checks, finished-part acceptance and repeatability criteria

Record open issues, who must resolve them and whose approval is required. Do not release tooling while a function-critical geometry, acceptance criterion or manufacturing route remains unresolved. For broader design questions, return to the MIM設計ガイド. For project-specific support, review MIM tooling capabilities および エンジニアリングレビュー.

MIM金型設計レビューのための図面を提出する

Send the drawing and CAD model with your critical dimensions, protected surfaces, material and expected production volume. Identify any features that may be changed or machined after sintering so the engineering review can compare practical tooling routes before investment.

図面を提出して金型設計レビューを受ける

MIM金型レビューのための技術参考資料

EPMA: 金属射出成形(Metal Injection Moulding) — design guidance for holes, parting lines, gates, ejection and undercuts.

BASF Catamold: MIM Process — feedstock selection and mold oversizing.

MPIF:金属射出成形 — process sequence. Material specifications are not universal tooling design rules.